Bukan project

General description of the project   This project is located in Niavaran, Serah Yasir, Gol Seng St., Mahmoudi 1, No. 49, as a commercial unit on three floors (ground floor, mezzanine, ground floor) with a substructure of 502 square meters in a commercial-residential complex. In 2014, the said project has been delivered.    

Nazar Gharbi Project of Isfahan

General description of the project This project is one of the delivered projects of the Abnie Gostar Karafarin Company. The project is located in the city of Isfahan, Nazar West Street, next to the Entrepreneur Insurance. According to the document, the area of ​​the land is equal to 296.8 square meters and after correction equals […]

Gonbad-e Qavus project

General description of the project This project is one of the delivered projects of Abniye Gostar Karafarin Company. The project is located in Gonbad Kavos city, South Imam Khomeini Street, between Golshan and Shohada alleys.    

Motahari project of Tehran

General description of the project This project is one of the delivered projects of the Abnie Gostar Karafarin  Company. The project is located in Motahari St. , next to Tehran Grand Hotel, No. 93, Mansour St., Tehran. The project was completed and temporarily delivered in 2014 and delivered definitively in 2015.    

Zahedan project

General description of the project This project is one of the projects delivered by Abnieh Gostar Karafarin company. The project is located in Zahedan city, at the intersection of University Street and 6-meter alley (University 8). The project was temporarily delivered in 1992 and delivered definitively in early 1994.    

Ardabil project

General description of the project This project is one of the renovation projects delivered by the Abnie Gostar Karafarin Building Company. The project is located in Ardabil city, Si-Metri Bazar St., next to Yaqouti Passage, and the project was temporarily delivered in 2013.    

شانزدهمین جلسه هیئت مدیره

به گزارش واحد روابط عمومی شرکت ابنیه گستر کارآفرین ، شانزدهمین جلسه هیئت مدیره روز شنبه مورخ 1402/07/08 مهرماه برگزار شد .   دستور جلسه به شرح زیر می باشد: ۱ ـ پیش درآمدی بر امکان تحول شرکت ۲ ـ مروری بر وضع موجود ۳ ـ ترسیم آینده مطلوب ۴ ـ گزارش عملکرد ۵ ـ […]

Mulla Sadra project

General description of the project This project is one of the delivered projects of the Abnie Gostar Karafarin Company. The project is located in Tehran, Molla Sadra St., between Shiraz St. and Sheikh Bahai St. No. 190. The project was delivered in 2014.      

Shariati project (Pole romi)

General description of the project The mentioned project with commercial-office use on Shariati St. – above Romi Bridge – on the corner of Mosivand St. on a plot of land with an area of ​​366.53 square meters and its branch was built on 09/21/1396 and final delivery of its administrative units and basements. On 11/20/1396, […]

Yusef Abad project

General description of the project The mentioned project is located in Asadabadi Street No. 430 and its executive operations were completed and it was put into operation in 2016 and is active. Five floors above the ground floor were built and completed on 11/23/1996.