{"id":849,"date":"2023-10-09T09:49:09","date_gmt":"2023-10-09T09:49:09","guid":{"rendered":"https:\/\/agk.co.ir\/?p=849"},"modified":"2023-12-20T04:20:20","modified_gmt":"2023-12-20T05:20:20","slug":"yusef-abad-project","status":"publish","type":"post","link":"https:\/\/agk.co.ir\/en\/yusef-abad-project\/","title":{"rendered":"Yusef Abad project"},"content":{"rendered":"<h2 class=\"elementor-heading-title elementor-size-default\">General description of the project<\/h2>\n<p>The mentioned project is located in Asadabadi Street No. 430 and its executive operations were completed and it was put into operation in 2016 and is active. Five floors above the ground floor were built and completed on 11\/23\/1996.<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-849 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/agk.co.ir\/en\/wp-content\/uploads\/2023\/10\/Untitled-14-Recovered.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/agk.co.ir\/en\/wp-content\/uploads\/2023\/10\/Untitled-14-Recovered-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/agk.co.ir\/en\/wp-content\/uploads\/2023\/10\/Untitled-15-Recovered.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/agk.co.ir\/en\/wp-content\/uploads\/2023\/10\/Untitled-15-Recovered-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/agk.co.ir\/en\/wp-content\/uploads\/2023\/10\/Untitled-13-Recovered.jpg'><img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/agk.co.ir\/en\/wp-content\/uploads\/2023\/10\/Untitled-13-Recovered-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>General description of the project The mentioned project is located in Asadabadi Street No. 430 and its executive operations were completed and it was put into operation in 2016 and is active. Five floors above the ground floor were built and completed on 11\/23\/1996. &nbsp; &nbsp;<\/p>\n","protected":false},"author":2,"featured_media":852,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-849","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-1"],"_links":{"self":[{"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/posts\/849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/comments?post=849"}],"version-history":[{"count":5,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/posts\/849\/revisions"}],"predecessor-version":[{"id":1839,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/posts\/849\/revisions\/1839"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/media\/852"}],"wp:attachment":[{"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/media?parent=849"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/categories?post=849"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/agk.co.ir\/en\/wp-json\/wp\/v2\/tags?post=849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}